Documents

Common general documents for the ESSnet

View the Project on GitHub I3S-ESSnet/Documents

I3S ESSnet

Monthly reporting: 15 April 2019

Work package 1

Action Progress Next steps Comments
RELAIS: Modelled the current architecture and capabilities 100% <ul><li>Preparing live demo for Rome hackathon;</li><li>Modeling the TO-BE architecture</li></ul> Istat
ARC: Initial assessment of the optimal solution to integrate RELAIS and ARC functionalities 30% <ul><li>Preparing live demo for Rome hackathon;</li><li>Modeling the TO-BE architecture</li></ul> Istat
Try PX-web current version 75%   INE
- Get Package PX-web / Install basic configuration / Test Local installation 100%   INE
- Generate INE data files from PX concepts 100%   INE
- Check how the PX information models work and map to dissemination and metadata structure 75%   INE
- Check what is required to run the ”open” version (upcoming) of PX-web 50%   INE
- Calculate impact on adapting existing dissemination chain 50%   INE

Work package 2

Action Progress Next steps Comments
Planning in detail (end feb/start of mars) VC 30% Set date for VC SCB,ISTAT,INSEE,SSB
Setup google-drive documents and share plus share prezi 0%   SCB
Setup the general structure of the documents 0%   SCB

Work package 3

Action Progress Next steps Comments
Simple Vagrant-file for building a virtual machine with Docker and Docker-compose 20%   SSB, INSEE (Frédéric++?, Romain)
Simple guidelines for developers for how to containarize existing services 0%   SSB, INSEE
Documentation for setting up a first version of a simple reference environment. 0%   SSB, INSEE, WP2
Build regime for images with automated testing 0%   SSB, INSEE

Work package 4

Action Progress Next steps Comments
       
Working story of reuse of PX-web 50%   INE
Reuse of tau-Argus / mu-Argus 25%   INE
Testimonies of end users / participants to ESSnet projects 25%   INE
Hackathon Rome – Success stories Define track 3 25%   INE / INSEE

Work package 5

Action Progress Next steps Comments
Minutes of KO meeting 100%    
Creation of logo 100%    
Preparation of Rome hackathon 50% Detailed organisation of each session All partners
Documentation of ARC 80%   With Istat