WP2 Planning

Planned steps

Action Progress Next steps Comments
Planning in detail (end feb/start of mars) VC 60% Set date for VC SCB,ISTAT,INSEE,SSB
Setup google-drive documents and share plus share prezi 80%   SCB
Setup the general structure of the documents 60%   SCB
During hackathon in Rome try to capture materials for scenarios in cookbook 100%   SCB
Translate the scenarios to the cookbook 90%   SCB
Build first draft of cookbook based on materials from hackaton 100%   SCB
Deliver draft of cookbook in May 100%   SCB
Work on architectural recomendations 15%   SCB
Work on interactive guidence 0%   SCB
Test the current output during modernstats world workshop 0%   SCB
Deliver draft of arch guidance in July 100%   SCB
VC with WP2 members in August 0%   SCB,ISTAT,INSEE,SSB
Between july and december - add guidance and scenarios based on experience and the work done in WP1 and WP3 0%   SCB
Align deliverables and deliver draft versions in dec 2019 0%   SCB
Setup indicators for test of usability in January 2020 0%   SCB
Test the deliverables using developers and architects that are not part of the work and get feedback in January 2020 0%   SCB,ISTAT,INSEE,SSB
Align WP2 deliverables with all other WPs in M14 0%   SCB,ISTAT,INSEE,SSB
Continued work on adding guidance, cookbook scenarios and interactive guidance M13-M18 0%   SCB
Align deliverables and deliver Drafts M13-M18 0%   SCB
Perform second test on deliverables M18 0%   SCB